Capacidade (kg) |
Altura de elevação (M) |
Modelo |
M/min |
KW |
(M/min) |
KW |
A FEM/ISO |
A FEM/ISO |
H
(Mm) |
C
(Mm) |
B(mm) |
||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
2000 | 6 | BMG-2.0 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 3M | M6 | 2M | M5 | 210 | 556 | 150-300 |
9 | BMG-2.0 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 3M | M6 | 2M | M5 | 210 | 556 | 150-300 | |
12 | BMG-2.0 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 3M | M6 | 2M | M5 | 210 | 556 | 150-300 | |
15 | BMG-2.0 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 3M | M6 | 2M | M5 | 210 | 556 | 150-300 | |
18 | BMG-2.0 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 3M | M6 | 2M | M5 | 210 | 556 | 150-300 | |
3200 | 6 | BMG-3.2 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 210 | 556 | 150-300 |
9 | BMG-3.2 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 210 | 556 | 150-300 | |
12 | BMG-3.2 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 210 | 556 | 150-300 | |
15 | BMG-3.2 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 210 | 556 | 150-300 | |
18 | BMG-3.2 | ,5/0,8 | 3.2/0.45 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 210 | 556 | 150-300 | |
5000 | 6 | BMG-5.0 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 260 | 596 | 200-350 |
9 | BMG-5.0 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 260 | 596 | 200-350 | |
12 | BMG-5.0 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 260 | 596 | 200-350 | |
15 | BMG-5.0 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 260 | 596 | 200-350 | |
18 | BMG-5.0 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 2M | M5 | 2M | M5 | 260 | 596 | 200-350 | |
6300 | 6 | BMG-6.3 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 1M | M4 | 2M | M5 | 260 | 596 | 200-350 |
9 | BMG-6.3 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 1M | M4 | 2M | M5 | 260 | 596 | 200-350 | |
12 | BMG-6.3 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 1M | M4 | 2M | M5 | 260 | 596 | 200-350 | |
15 | BMG-6.3 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 1M | M4 | 2M | M5 | 260 | 596 | 200-350 | |
18 | BMG-6.3 | ,5/0,8 | 6.1/1 | 5/20 | 0,37 | 1M | M4 | 2M | M5 | 260 | 596 | 200-350 |